基于計(jì)算機(jī)的電廠鍋爐監(jiān)控系統(tǒng)外文翻譯、中英文翻譯、外文文獻(xiàn)翻譯
基于計(jì)算機(jī)的電廠鍋爐監(jiān)控系統(tǒng)外文翻譯、中英文翻譯、外文文獻(xiàn)翻譯,基于,計(jì)算機(jī),電廠,鍋爐,監(jiān)控,系統(tǒng),外文,翻譯,中英文,文獻(xiàn)
附錄A 譯文基于計(jì)算機(jī)的電廠鍋爐監(jiān)控系統(tǒng)J Taler1, BWeglowski1, W Zima1*, P Duda1, S Gradziel1,T Sobota1,A Cebula1,and D Taler2工藝和電力工程研究所,克拉科夫大學(xué),波蘭AGH科技大學(xué),波蘭接受時(shí)間:2007.2.2, 公布時(shí)間(經(jīng)修改)2007.10.24摘要以計(jì)算機(jī)為基礎(chǔ)的鍋爐性能監(jiān)測(cè)系統(tǒng)的開(kāi)發(fā),首要進(jìn)行熱工計(jì)算,測(cè)量各種溫度,熱通量,壓力和燃料,分析數(shù)據(jù),這些數(shù)據(jù)被用來(lái)進(jìn)行傳熱分析,以便控制蒸發(fā)器,電爐,以及流量等。一個(gè)新的工藝技術(shù)熱通量管,用來(lái)確定所吸收的熱通量。通量管安裝在不同級(jí)別的鍋爐中,其工作條件類似于水墻管。熱通量測(cè)量燃煤蒸汽鍋爐是目前比較好的選擇。鍋爐負(fù)荷是變化的,水循環(huán)必須不能超出一定范圍。迅速增加的壓力可能會(huì)導(dǎo)致水因過(guò)渡沸騰而使水冷壁無(wú)法保護(hù)爐墻,而迅速下降的壓力,導(dǎo)致鍋爐系統(tǒng)中的鍋爐蒸發(fā)器所有要素迅速下降。這兩種情況下會(huì)導(dǎo)致水循環(huán)流動(dòng)停滯 ,導(dǎo)致管道開(kāi)裂。兩個(gè)流量計(jì)組裝在210(蒸汽能力 210X103千克/小時(shí))鍋爐自然水循環(huán)過(guò)程中進(jìn)行。根據(jù)這些測(cè)量,壓力改變時(shí)鍋爐過(guò)熱器最高速度應(yīng)被限制。根據(jù)實(shí)時(shí)計(jì)算,燃燒室可以實(shí)時(shí)確定需要多少熱流量轉(zhuǎn)移到電站鍋爐蒸發(fā)器。此外, 表面清潔度,選擇性吹灰,也可用在具體的問(wèn)題中介紹。鍋爐監(jiān)控系統(tǒng)也提供詳細(xì)的鍋爐效率的變化和經(jīng)營(yíng)狀況,在后一階段對(duì)特定吹灰序列進(jìn)行分析和優(yōu)化。本文還分析了在啟動(dòng)和關(guān)閉的鍋爐時(shí),鍋爐氣鼓中的壓力關(guān)鍵詞:電站鍋爐,熱通量的測(cè)量,蒸發(fā)器,水循環(huán),性能和熱應(yīng)力監(jiān)測(cè)1 緒論電站鍋爐關(guān)閉和啟動(dòng)進(jìn)程,以及鍋爐負(fù)荷的變化過(guò)程中,不容許鍋爐應(yīng)力超過(guò)限制,而至關(guān)重要的是水循環(huán)要時(shí)刻保持著。迅速增加的壓力可能會(huì)導(dǎo)致水因過(guò)渡沸騰而使水冷壁無(wú)法保護(hù)爐墻,而迅速下降的壓力,導(dǎo)致鍋爐系統(tǒng)中的鍋爐蒸發(fā)器所有要素迅速下降,這兩種情況下會(huì)導(dǎo)致流動(dòng)停滯水循環(huán)中的蒸發(fā)器,導(dǎo)致管道開(kāi)裂。因此,在210(鍋爐容量為 210X103千克/小時(shí)的生活蒸汽,9.8兆帕的壓力和530到545的溫度)鍋爐自然水循環(huán)過(guò)程中要組裝兩個(gè)流量計(jì)。根據(jù)水循環(huán)參數(shù)確定一個(gè)鍋爐蒸發(fā)器的最大壓力??刂频闹饕蝿?wù)是鍋爐負(fù)荷變化限制在標(biāo)準(zhǔn)范圍內(nèi)。比如說(shuō)鍋爐汽鼓,特別是汽鼓和鍋爐管道的連接處,特別要強(qiáng)調(diào)在這些連接處,同等的分配壓力,因?yàn)樗麄冊(cè)诤艽蟪潭壬?,?duì)鍋爐汽包的加熱和冷卻率有影響。鍋爐制造商建議的具體加熱和冷卻率是有所保留的,鍋爐汽鼓,往往可能是比建議的大些。通過(guò)提高利用率的這種方法,鍋爐瞬變的時(shí)間可縮短。 監(jiān)測(cè)的任務(wù)還包括鍋爐監(jiān)測(cè)范圍內(nèi)很多的其他參數(shù),包括影響其效率和安全性的參數(shù)。目前提出了一種系統(tǒng),可以在線監(jiān)測(cè)的運(yùn)行條件下的蒸發(fā)器。其基本內(nèi)容是一套原始熱通量管用來(lái)確定溫度和熱負(fù)荷分布的高度鍋爐燃燒室。重要的是檢測(cè)正常運(yùn)行的蒸發(fā)器和燃燒室。所得結(jié)果也可以用來(lái)監(jiān)測(cè)流通水蒸汽混合物和沉積物在水冷壁管內(nèi)表面的沉積多少。該系統(tǒng)輔以測(cè)量蒸汽水的流量,控制循環(huán)系統(tǒng),鍋爐的在線模式也應(yīng)考慮到由于系統(tǒng)的可變性,可能會(huì)導(dǎo)致空氣過(guò)量的問(wèn)題,這直接影響鍋爐效率。其解決的辦法,可減少相應(yīng)的供給,如鼓風(fēng)量和相應(yīng)開(kāi)關(guān)的開(kāi)通量,同時(shí)利用熱通量管設(shè)在不同的層次??諝夥峙鋺?yīng)確保排放的氮氧化物和內(nèi)含易燃物、內(nèi)含容粉煤灰低于允許的水平。那個(gè)正確的估計(jì)程度的結(jié)渣中的鍋爐燃燒室也非常重要。時(shí)間變化的分庭墻結(jié)渣系數(shù),隨著變化的水體流向 ,其它系統(tǒng)可可根據(jù)程序自動(dòng)激活并運(yùn)行,包括送煤機(jī)、除渣機(jī)和鼓風(fēng)機(jī)。 比較,計(jì)算和測(cè)量過(guò)熱蒸汽質(zhì)量流量,燃燒室壁平均結(jié)渣一定程度的時(shí)間。這樣吹灰器可以充分自動(dòng)化的運(yùn)行在一個(gè)燃燒室,因此也會(huì)充分使用吹灰器并增加水冷壁壽命。在線計(jì)算燃燒室實(shí)時(shí)熱流量,其流量是轉(zhuǎn)移到電站鍋爐蒸發(fā)器?;谀芰科胶猓?jì)算電站鍋爐蒸發(fā)器的過(guò)熱蒸汽質(zhì)量流量。一些調(diào)查人員已促成各種方面的熱性能和剩余壽命理論研究來(lái)監(jiān)測(cè)發(fā)電廠。檢測(cè)熱信號(hào)的在線檢測(cè)被許多論文中被認(rèn)可5,6,用于在線檢測(cè)疲勞退化程度的有限元的疲勞監(jiān)測(cè)系統(tǒng)顯示在參考7,文件 8 介紹了實(shí)際已經(jīng)執(zhí)行部分在線監(jiān)測(cè)的發(fā)電廠。2 熱負(fù)荷測(cè)量燃燒室壁由于測(cè)量高溫?zé)煔鈺r(shí)有很多困難的,鍋爐燃燒室在熱負(fù)荷運(yùn)行,對(duì)其檢測(cè),用測(cè)溫用儀器如圖1。熱負(fù)荷的密度吸收熱通量,其定義是:同比熱流量吸收爐墻表面積熱量,溫度測(cè)量器的插入前端(如圖1中1處),溫度測(cè)量選擇四個(gè)鎳鎳鉻熱電偶(外直徑鞘相當(dāng)于1毫米) ,放置在洞內(nèi),插入到平行軸,避免錯(cuò)誤造成的熱傳導(dǎo)沿軸的滑動(dòng)空隙流出。這種分配原因是溫度保持不變, 20毫米寬槽,是溫度計(jì)所在,是涵蓋了3毫米耐熱金屬板材,預(yù)防被焚燒(圖1)。中心被填充20g鋼,導(dǎo)熱系數(shù)K的確定K(T)=53.26-0.0235684TW/(mk) (1)插入是否能夠安全工作,計(jì)算方法采用有限元方法演算。平均壓力假設(shè)為P=11 MPa和系統(tǒng)的溫度被假設(shè)為T=370攝氏度,利用軟件,參考10 可等于118兆帕的壓力,而最大應(yīng)力在假定負(fù)荷等于73兆帕。因此,最大應(yīng)力低于允許值。圖中,我水冷壁管;, 離心管;,耐熱金屬薄膜覆蓋;,管以外的鍋爐,以及1-5個(gè)位置圖1 熱負(fù)荷測(cè)量。Fig.1 Heat load measuring inser2.1 熱負(fù)荷能力說(shuō)明為了確定水冷壁熱負(fù)荷的供給,溫度T1、T2、T3、和T4四點(diǎn)測(cè)得測(cè)量值。熱分布計(jì)算使用方法為有限容量的CFD軟件 11 。平均溫度差 (2)由于對(duì)稱性的溫度測(cè)量器插入,只有插入一半的截面,插入表面的密度變化的熱通量取決于結(jié)渣因子C ,其中的變化顯著的位置。插入表面上的分散熱通量密度接近使用步驟線。后表面插入和管完全絕緣。管的內(nèi)表面屬于第三種邊界條件,需要的知識(shí)有熱傳熱系數(shù)A和平均溫度等假定,熱負(fù)荷可以表示為一個(gè)函數(shù)的測(cè)量溫度差 (3)其中溫差有公式2獲得。溫度T1、T2、T3、和T4四點(diǎn)計(jì)算使用CFD軟件 11 在熱負(fù)荷q及傳熱系數(shù)和溫度介質(zhì)假設(shè)的前提下Tm為320度。結(jié)果的數(shù)值計(jì)算近似使用的功能( 3 )通過(guò)最小二乘法。常數(shù)A和B ,其中取決于傳熱系數(shù)A對(duì)內(nèi)表面的插入深度。a=8367.9549W/m2 b=5357.8165W/(m2k) for a=6800.9789W/m2 b=5432.89W/(m2k) for a=4899.9549W/m2 b=5519.0645W/(m2k) for 分析的變化,證明,傳熱系數(shù)A的內(nèi)表面的管道有一個(gè)輕微影響熱負(fù)荷值q。這略微令人吃驚的結(jié)果可以解釋事實(shí)上,當(dāng)值的減小,導(dǎo)致溫度通過(guò)厚度的壁。同時(shí),減少系數(shù)原因增加了插入溫度對(duì)一側(cè)的爐,而這反過(guò)來(lái)又造成減少熱傳導(dǎo)k確定由方程( 1 )和增加的溫度通過(guò)減少厚度的墻。這兩個(gè)相反的現(xiàn)象。 (4)方程( 4 )得出的假設(shè),即插入的內(nèi)部表面是干凈的,沒(méi)有殘留的低導(dǎo)熱系數(shù)(鍋爐規(guī)?;蜩F的氧化物)的表面。如果內(nèi)部表面插入覆蓋規(guī)模沉積,然后增加插入溫度前表面,反過(guò)來(lái)又造成增加周圍熱流在減少。為了證明正確的熱負(fù)荷q在測(cè)量時(shí),當(dāng)插入內(nèi)表面上沉積特征的規(guī)模使低導(dǎo)熱系數(shù)積累,計(jì)算溫度分布,插入清潔內(nèi)表面和骯臟的內(nèi)表面那樣,用流利溫度測(cè)量器插入位于十五點(diǎn)四米水平的正面墻上密度吸收熱通量流Q計(jì)算運(yùn)用這些數(shù)據(jù),一是插入時(shí)沒(méi)有任何沉積物,另一個(gè)是有一點(diǎn)厚度的沉積物d=0.5毫米,兩者進(jìn)行比較,計(jì)算如下 (6)表1在橫截面的特征點(diǎn)的溫度Table 1 Temperatures at the characteristic points of thecross-section溫度無(wú)沉積物溫度標(biāo)準(zhǔn)溫度有沉積物溫度T1404.43405.1642.00T2402.05402.4636.58T3365.59366.8600.86T4363.99364.1596.36T5318.2318.2344.65分析結(jié)果證明,標(biāo)準(zhǔn)溫度相對(duì)與有沉積物的溫度更接近與無(wú)沉積物的溫度,假設(shè)有沉積物溫度為T,根據(jù)公式4密度的熱流Q計(jì)算 (7)所獲得熱負(fù)荷價(jià)值和公式6所的結(jié)果非常的相似q=220135.9W/m2沉積物對(duì)熱負(fù)荷的測(cè)量沒(méi)有不良影響。2.2 熱負(fù)荷測(cè)量所描述的傳感器被安裝在210鍋爐的燃燒事的水冷壁的前端,4個(gè)傳感器安裝在不同的高度,12.6,15.4,19.3,23m。實(shí)時(shí)計(jì)算,傳感器的熱負(fù)荷Q可以顯示在監(jiān)視器上。熱負(fù)荷的參數(shù)連續(xù)函數(shù)如圖2(a)。分析數(shù)字證明,最高值出現(xiàn)的熱負(fù)荷略高于刻錄機(jī). 受影響最大的是在15。4米處。如圖2(b)選定的測(cè)量和計(jì)算結(jié)果:(a)測(cè)量溫度的歷史和熱負(fù)荷計(jì)算的測(cè)量插入位于高度為15.4米,和( b )熱載荷分布1 - 4 測(cè)量刀片,第一和第二兩排燃燒器位置,分別在高度為10.4和12.6米。圖2(a)溫度和熱流量隨時(shí)間變化圖,(b)傳感器高度和熱流量關(guān)系Fig 2 (a) temperature and heat flux variation with time, (b) the sensor height and the relationship between heat flux3 鍋爐水循環(huán)系統(tǒng)的測(cè)量鍋爐的啟動(dòng)和關(guān)閉過(guò)程,以及鍋爐負(fù)荷的變化中,不超過(guò)允許應(yīng)力,而水循環(huán)基本維持在一定的范圍,迅速增加的壓力可能會(huì)導(dǎo)致水因過(guò)渡沸騰而使水冷壁無(wú)法保護(hù)爐墻,而迅速下降的壓力,導(dǎo)致鍋爐系統(tǒng)中的鍋爐蒸發(fā)器所有要素迅速下降。這兩種情況下會(huì)導(dǎo)致水循環(huán)流動(dòng)停滯 ,導(dǎo)致管道開(kāi)裂。210鍋爐實(shí)際水循環(huán)中水流率連續(xù)測(cè)量?jī)纱危◤目偟?0 )。降液管的外徑二百七十三毫米和壁厚25 mm。流量計(jì)安裝在高度為10.5和11.5 m處。在穩(wěn)態(tài)鍋爐運(yùn)行(鍋爐效率之間波動(dòng)180-210X103 千克/小時(shí)),和流通計(jì)算分析如圖,速度在下降管中介于1.6和1.8米/秒,而流通比率約為8到9。在此基礎(chǔ)上測(cè)量水的流量及其變化范圍,允許的最大壓力變化率被確定為的DP / dt的蒸發(fā)器(以避免停滯的水循環(huán)蒸發(fā)器) 。測(cè)量水的流速(1.6到1.8米/秒)和壓力p =10.79兆帕,開(kāi)始的時(shí)候,的允許壓力應(yīng)降低到范圍從0.023到0.027兆帕/ s(圖4 ( a ) ) 。因制造商的建議在鍋爐汽包降低壓力,定為2K/分。圖3測(cè)量水流速度Fig 3 Measured water velocity histories圖4 減壓比例: (a)允許壓力降率近似值以及(b)時(shí)間與壓力下降率之間的關(guān)系Fig 4 Decompression ratio of: (a) allow the approximation of pressure drop rate and (b) pressure drop in the rate of time and the relationship between壓力降低率的測(cè)量目的是蒸發(fā)器中的水循環(huán)圖4(b) 。分析證明,如果加熱鍋爐汽包和冷卻速度不超過(guò)制造商建議,就沒(méi)有不穩(wěn)定的風(fēng)險(xiǎn)。4 熱工檢測(cè)下面談?wù)摰腻仩t效率的缺陷,燃料和生活蒸汽大規(guī)模流動(dòng)以及爐結(jié)焦的因素是討論的細(xì)節(jié)。當(dāng)煤燃燒,一小部分的灰會(huì)造成沉積,高溫結(jié)渣是為熔融形成,部分熔融沉積爐墻壁和其他表面。污染影響對(duì)流換熱吸收,如過(guò)熱器和再熱器,渣和污染關(guān)鍵是影響燃煤電站鍋爐可靠性和可用性。然而,鍋爐表面存在的渣僅是一小部分,沉積是多方面的,污染以間接的形式影響高蒸汽和煙氣溫度,它們所造成的低質(zhì)量流量飽和蒸汽由蒸發(fā)器溫度進(jìn)入對(duì)流表面,造成溫度過(guò)熱蒸汽增加,并保持恒定的高溫度的,所以鍋爐必須定期除渣,例如,煙氣溫度離開(kāi)煙囪過(guò)熱,就應(yīng)該開(kāi)始吹灰,吹氣時(shí),達(dá)到一定壓力值,說(shuō)明已經(jīng)結(jié)渣和污染狀況,但這些跡象可能造成一定錯(cuò)誤,墻吹灰器是最常用的一個(gè)除渣工具,每天一次和三次,后者使用頻率可能是令人驚訝。必須最大限度地吸收熱量,以防止有時(shí)再熱蒸汽溫度過(guò)熱?;谟?jì)算機(jī)的鍋爐性能監(jiān)控,在爐膛和對(duì)流表面檢測(cè)溫度,壓力,流動(dòng)和氣體分析的數(shù)據(jù)被用來(lái)執(zhí)行傳熱分析爐膛和對(duì)流,由測(cè)量值說(shuō)明表面清潔度,風(fēng)機(jī)順序可根據(jù)實(shí)際優(yōu)化,清潔的要求,而不是固定時(shí)間,鍋爐監(jiān)控系統(tǒng)還提供細(xì)節(jié)的變化,鍋爐效率和吹灰條件,可事后分析與優(yōu)化。4.1 鍋爐效率 鍋爐效率的計(jì)算采用在線模式。注意鍋爐效率隨時(shí)間的變化,可以改變參數(shù),如質(zhì)量流量,空氣供應(yīng),以提高效率,確定熱效率首先是基于熱值和煤量。 (8)介質(zhì)全部熱量(水和水蒸汽),隨煤和空氣進(jìn)如鍋爐的熱量,損失的熱量。 (9)損失有以下集中一,干煙氣損失;二,未燃盡氣體損失;三,可燃的煤粉煤灰;四,燃燒爐底灰;五,輻射和下落不明的損失;六,合理的熱損失在爐底灰。4.2 燃料質(zhì)量流量和蒸汽爐膛結(jié)渣的因素穩(wěn)定狀態(tài)條件基于鍋爐效率評(píng)估在線模式下,煤炭質(zhì)量流量將取決于鍋爐熱效率如圖5( a )圖5控制質(zhì)量和能量平衡Fig 5 to control the quality and energy balance(a)鍋爐: 1 ,鍋爐; 2第一階段過(guò)熱; 3 ,第二階段過(guò)熱; 4 ,最后過(guò)熱; 5第一階段保溫; 6 ,第二階段保溫(b)鍋爐蒸發(fā)器: 1 ,滾筒; 2 ,下降管; 3 ,蒸發(fā)器; 4 ,水冷壁 ; 5 ,第一階段過(guò)熱; 6 ,第二次現(xiàn)階段過(guò)熱; 7 ,最后過(guò)熱; 8,第一次階段保溫; 9,第二階段保溫 (10)經(jīng)過(guò)一些變換方程,繼獲得公式(11)計(jì)算實(shí)際空氣流動(dòng)的公式 (12)質(zhì)量和體積流量上根據(jù)煙氣計(jì)算出來(lái)的。方程( 11 )只適用于穩(wěn)態(tài)條件下燃料質(zhì)量流量,鍋爐蒸發(fā)器負(fù)荷從質(zhì)量和能量平衡角度考慮,圖5(b) (13) (14)由公式13和14得到 (15)結(jié)渣C因子估方程 (18)活蒸汽流量米計(jì)算利用方程( 15 ),作為結(jié)渣因子c.取決于鍋爐孔板在出口流量實(shí)測(cè)流量4.3燃料質(zhì)量流量蒸汽質(zhì)量流量從鍋爐蒸發(fā)器開(kāi)始,質(zhì)量和能在量整個(gè)蒸發(fā)器多少可以控制,這是水和水蒸汽混合。 (17) (18)結(jié)合質(zhì)量守恒和能量守恒定律(19)從條件中饒了質(zhì)量是確定的 (20)計(jì)算熱流量是方程(19)是一個(gè)功能。計(jì)算燃料質(zhì)量流量的情況,可以用非線性方程( 20 )解決,運(yùn)用區(qū)間搜索或反復(fù),例如,牛頓迭代法。 4.3 結(jié)果基于計(jì)算機(jī)的在線監(jiān)測(cè)系統(tǒng),檢測(cè)鍋爐的性能,如上文所述安裝在210電站鍋輸入數(shù)據(jù)運(yùn)行監(jiān)測(cè)列于表2 。選定的結(jié)果與使用本系統(tǒng)中顯示圖6和7。表2輸入數(shù)據(jù)和鍋爐運(yùn)行檢測(cè)結(jié)果Table 2 Input data and the results of monitoring powerboiler operation數(shù)據(jù)結(jié)論蒸汽壓力蒸汽溫度空氣溫度給水溫度出口溫度煙氣相對(duì)濕度含氧量?jī)魺嶂祵捲谌剂匣曳趾棵悍廴紵剂蠠煔庖谎趸及俜直人魉俣炔迦朦c(diǎn)放在四個(gè)傳感器溫度蒸汽質(zhì)量流量水保溫質(zhì)量流量的排污水流重汽包壓力噴水溫度引水溫鍋爐效率過(guò)量空氣計(jì)算鍋爐熱功率燃料質(zhì)量流量燃?xì)饬髁吭谌紵页隹谌紵龤怏w溫度結(jié)渣的因素燃燒室熱負(fù)荷蒸汽質(zhì)量流量空氣損失量燃料損失量圖6 ( a )鍋爐效率( b )和燃料質(zhì)量流量Fig.6(a)Boiler efficiency(b)and fuel mass flow圖7在爐膛出口燃燒氣體溫度( a )和質(zhì)量流量( b )Fig.7 Combustion gas temperature(a)and mass flow(b)at the furnace chamber outlet圖8 鍋爐汽包的加熱和冷卻: (a) 溫度和壓力的歷史( b )在鍋爐啟動(dòng)時(shí)熱負(fù)荷和壓力分布。Figure 8 Boiler heating and cooling: (a) the history of temperature and pressure (b) start in the boiler heat load and pressure distribution.圖9鍋爐汽包降交界處:(a)應(yīng)力集中點(diǎn)(點(diǎn)P)和(b)周向應(yīng)力Figure 9 down at the junction of boiler drum: (a) stress concentration point (point P) and (b) circumferential stress計(jì)算機(jī)在在線檢測(cè)下,并繪出圖形,進(jìn)行監(jiān)測(cè)選定的參數(shù),結(jié)渣的因素確定方程( 16 )取決于清潔燃燒爐墻和范圍從0.5至0.72 。5 強(qiáng)度條件的控制對(duì)210鍋爐下降管強(qiáng)度進(jìn)行計(jì)算,考慮鍋爐汽包加熱/冷卻速度,確保壓力平衡210鍋爐加熱和冷卻在圖8(a)中顯示。計(jì)算的溫度和應(yīng)力場(chǎng)進(jìn)行了一個(gè)邊緣降。鍋爐汽包材質(zhì)是K22M鋼,其外徑一千八百八十零毫米和壁厚90 mm.Downcomers與外直徑102毫米,壁厚6毫米考慮到這些因素,鼓飽和壓力才能確定,根據(jù)溫度的變化(圖8(a)項(xiàng))。 減少內(nèi)部的熱負(fù)荷,啟動(dòng)鍋爐是在圖8 ( b )項(xiàng)。鍋爐鼓降交界處周向應(yīng)力的變化是在圖(a),鍋爐汽包內(nèi)表面點(diǎn)應(yīng)力變化圖( b )證明,鍋爐啟動(dòng)和關(guān)閉最大應(yīng)力點(diǎn)的應(yīng)力約束低于允許值,計(jì)算表明,如果制造鍋爐汽包加熱和冷卻率超過(guò)建議值,沒(méi)有超過(guò)允許應(yīng)力和不會(huì)造成造成不穩(wěn)定的水循環(huán)。鍋爐啟動(dòng)和關(guān)閉程序是一個(gè)重要組成部分,即鍋爐汽包不能超過(guò)允許溫度變化的最小和最大值,分析這一數(shù)字表明,在最初的熱化階段,允許利率上升是由于承擔(dān)鍋爐啟動(dòng)程序.開(kāi)始啟動(dòng)過(guò)程中,密集的蒸汽冷凝發(fā)生在鍋爐汽包中。圖10 210鍋爐的鍋爐汽包升溫速率和壓力Figure 10 210 boiler drum boiler heating rate and pressure6 結(jié)論基于計(jì)算機(jī)的性能監(jiān)控鍋爐系統(tǒng)基于鍋爐在線檢測(cè)的模式,檢測(cè)溫度,壓力,熱通量,流量。這些數(shù)據(jù)被用來(lái)進(jìn)行傳熱分析,以便控制蒸發(fā)器,電爐,以及流量等。為了控制水循環(huán),流量計(jì)安裝在210鍋爐兩下降管中,并在此基礎(chǔ)上計(jì)算水流通.測(cè)量水的速度,最大允許壓力,變化中的蒸發(fā)器,防止水蒸汽停滯 ,分析強(qiáng)調(diào)鍋爐運(yùn)行可得出結(jié)論,如果鍋爐汽包超過(guò)制造商建議的加熱和冷卻利率,但不能超過(guò)允許壓力.利用有限元方法,由210鍋爐下降管的壓力分析,人們可以看到,鍋爐汽包在在一個(gè)允許的速率v=2K/min和冷卻速率在v=2K/min,溫度差異,達(dá)到約60 K,超過(guò)制造商的允許標(biāo)準(zhǔn).這是由于啟動(dòng)過(guò)程,鍋爐汽包只是部分裝滿了水。該系統(tǒng)開(kāi)發(fā)的監(jiān)測(cè)熱流量和強(qiáng)度,通過(guò)適當(dāng)?shù)姆峙淇諝忮仩t可提高鍋爐效率,使氣體排放和粉煤灰等可燃元素不超過(guò)允許值。此外,該系統(tǒng)可定期確定以下參數(shù):燃料質(zhì)量流量,空氣流通,煙氣流動(dòng),煙氣溫度.它允許評(píng)估燃燒室一定程度的污染. 燃燒室結(jié)渣因素,計(jì)算和測(cè)量鍋爐質(zhì)量效率。改變水的質(zhì)量流量,以并改變排煙溫度,第二階段的蒸汽過(guò)熱器,可以形成根自動(dòng)激活系統(tǒng)的爐渣和鼓風(fēng)機(jī)。高精度測(cè)量水冷壁熱負(fù)荷,鍋爐燃燒水冷壁溫度變化(燃燒和煙氣溫度監(jiān)測(cè))。測(cè)量結(jié)果也可用于控制的流通汽水和內(nèi)表面沉積的規(guī)模,對(duì)水冷壁檢測(cè).可用于燃燒室分析。附錄B 外文文獻(xiàn)Computer system for monitoring power boiler operationJ Taler1,B We glowski1,W Zima1*,P Duda1,S Gra dziel1,T Sobota1,A Cebula1,and D Taler21Institute of Process and Power Engineering,Cracow University of Technology,Krako w,Poland2AGH University of Science and Technology,Krako w,PolandThe manuscript was received on 2 February 2007 and was accepted after revision for publication on 24 October 2007.DOI:10.1243/09576509JPE419Abstract:The computer-based boiler performance monitoring system was developed to per-form thermal-hydraulic computations of the boiler working parameters in an on-line mode.Measurements of temperatures,heat flux,pressures,mass flowrates,and gas analysis datawere used to perform the heat transfer analysis in the evaporator,furnace,and convection pass.A new construction technique of heat flux tubes for determining heat flux absorbed bymembrane water-walls is also presented.Flux tubes mounted at different levels in the boilerwork at similar conditions as water-walls tubes.The current paper presents the results ofheat flux measurement in coal-fired steam boilers.During changes of the boiler load,the necessary natural water circulation cannot beexceeded.A rapid increase of pressure may cause fading of the boiling process in water-walltubes,whereas a rapid decrease of pressure leads to water boiling in all elements of the boilersevaporator water-wall tubes and downcomers.Both cases can cause flow stagnation in thewater circulation leading to pipe cracking.Two flowmeters were assembled on central downco-mers,and an investigation of natural water circulation in an OP-210 boiler(with steam capacityof 210?103kg/h)was carried out.On the basis of these measurements,the maximum rates ofpressure change in the boiler evaporator were determined.The on-line computation of the conditions in the combustion chamber allows for real-timedetermination of the heat flowrate transferred to the power boiler evaporator.Furthermore,with a quantitative indication of surface cleanliness,selective sootblowing can be directed atspecific problem areas.A boiler monitoring system is also incorporated to provide details ofchanges in boiler efficiency and operating conditions following sootblowing,so that the effectsof a particular sootblowing sequence can be analysed and optimized at a later stage.The current paper also presents an analysis of stresses occurring in the boiler drum and thedowncomer junction during-start up and shut-down of the boiler.Keywords:power boiler,heat flux measurement,evaporator,natural water circulation,performance and thermal stress monitoring1INTRODUCTIONPower boiler shut-down and start-up processes,aswell as boiler load changes,should be carried outsuch that no allowable stresses in the boiler areexceeded,while the essential natural circulation ismaintained at all times.A rapid increase of pressure may cause fading ofthe boiling process in water-wall tubes,whereas arapid decrease of pressure leads to water boiling inall elements of the boilers evaporator water-walltubes and downcomers.Both cases can cause flowstagnation in water circulation in the evaporatorthat leads to pipe cracking.Thus,the flowmeterswere assembled on two downcomers of the OP-210boiler(theboilercapacityis210?103kg/hoflive steam with 9.8 MPa pressure and 54052108Ctemperature).An investigation of natural water circu-lation was carried out and the maximum rates of*Corresponding author:Institute of Process and Power Engineer-ing,Cracow University of Technology,AL.Jana Pawla II 37,Krako w 31-864,Poland.email:zimamech.pk.edu.pl13JPE419#IMechE 2008Proc.IMechE Vol.222 Part A:J.Power and Energypressurechangeintheboilerevaporatorweredetermined.Stresses are mainly controlled by the so-called cri-terion elements that limit the rate of boiler loadchanges.One such elements is the boiler drum,andin particular its connection with the downcomers.The distribution of equivalent and circumferentialstresses for these connections depends,to a largeextent,on the boiler drums heating and coolingrates.The boiler manufacturers reserve the right torecommend the specific heating and cooling ratesfor boiler drums,that often could be larger.Byincreasing such rates the operation time of a boilerunder transient conditions can be shortened.The monitoring of an operating boiler also includesthe monitoring of a wide range of other parametersthat affect its efficiency and safety.The current paper presents a system that allowson-line monitoring of operating conditions for anevaporator.Its basic element is a set of original heatflux tubes used to determine the temperature andheat load distribution along the height of the boilerscombustion chamber.This heat distribution is veryimportant for the proper operation of the evaporatorand combustion chamber 14.The obtained resultscould also be used to monitor the circulation ofwatervapour mixture and the scale deposition onthe inner surfaces of waterwall tubes.The system issupplemented by measurements of water mass flowcirculating in the boilers evaporator from two centraldowncomers.The monitoring of thermal-flow conditions of aboiler in the on-line mode should also take intoaccount the variability of the excess air number,which directly influences the boiler efficiency.Itsvalue can be reduced by means of the appropriateair distribution(primary,secondary,and over-firedair(OFA)nozzles)while using the heat flux tubeslocated at different levels.Air distribution shouldensure the emission of NOxand the content of flam-mable elements in fly-ash below allowable levels.Thecorrect estimation of the degree of slagging in theboilers combustion chamber is also very important.Time changes of the chamber wall slagging coeffi-cient,along with changes of water mass flows toinjection attemperators,and the temperature of fluegas can be the basis for an automatic activation ofslag and ash blowers in the boiler.Comparing the computed and measured super-heated steam mass flowrate,the average slaggingdegree of a combustion chamber wall is determinedin the on-line mode.This allows for full automationof soot blowers operating in a combustion chamber,therefore reducing the medium usage in soot blowersand increasing the water-wall lifetime.Theon-linecomputationofthecombustionchamberallowsforreal-timeheatflowratedetermination,whichis transferred to the power boiler evaporator.Based onthe energy balance for the power boiler evaporator,the superheated steam mass flowrate is computed(takingintoaccountthewaterflowrateforattemperators).Several investigators have contributed to variousaspects of thermal performance and remnant lifemonitoring of power plants.The monitoring of thermal conditions in powerplants is considered in many papers 5,6.Afinite-element-basedfatiguemonitoringsystemdeveloped for on-line monitoring of fatigue degra-dation of components used in various plants isshown in reference 7.Paper 8 describes practicalexamples where component life monitoring hasbeen implemented on power plants.The results offull-scale investigations on fouling in convective bun-dles of coal-fired boilers are presented in paper 9.2HEAT LOAD MEASUREMENT OF THECOMBUSTION CHAMBER WALLSDue to the difficulties occurred while measuring thehigh temperature of flue gas,the measurement ofthe heat load of the boilers combustion chamberusing the thermometric inserts presented in Fig.1was proposed.The heat load is the density of theabsorbed heat flux,defined as the ratio of the heatflowrate absorbed by the wall to the projected wallsurface area,and was determined on the basis oftemperature measurement of the insert located onFig.1Heat load measuring insert:I,waterwall pipe;II,eccentric pipe;III,heat resistant metal sheetingcover;IV,pipe leading the thermoelementsoutside the boiler,and 15 location of thethermoelements14J Taler,B We glowski,W Zima,P Duda,S Gra dziel,T Sobota,A Cebula,and D TalerProc.IMechE Vol.222 Part A:J.Power and EnergyJPE419#IMechE 2008its front side(points I to IV in Fig.1).The insert wasmade of carbon steel,and the temperature wasmeasured using four Ni-NiCr thermocouples(outsidediameter of the sheath equalling 1 mm),placed inholes located parallel to the axis of the insert toavoid errors caused by heat conduction along theaxis of the thermoelement outputs.This distributionof the openings causes the temperature of the ther-moelement to remain constant,and assures thatheat flows neither in nor out of the point in whichthe temperature is measured.The thermoelementsare led out at the back of the tubes.A 20 mm widegroove,in which the thermoelements are located,iscovered by a 3 mm heat resistant metal sheet pre-venting burning of the thermoelements(Fig.1).The insert was made of 20G steel,for which thethermal conductivity k was determined by theexpressionkT 53:26?0:02376224?T W=mK1To check whether the insert was able to work safely,computations using the finite-element method wereperformed.The pressure of the medium was assumedto be p 11 MPa and the temperature of the systemwas assumed to be T 3708C.The results of thosecomputations,carried out with the use of theANSYS software,are presented in reference 10.Allowablestressequals118 MPa,whereasthemaximumstressattheassumedloadequals73 MPa.Thus,the maximum stress is lower than theallowable one.2.1Description of the heat load determinationmethodIn order to determine the waterwall heat load depen-dency q q(DT),temperatures T1,T2,T3,and T4measured at four points of the front insert were used(Fig.1).The heat distribution was computed using themethod of finite capacity from the CFD software 11.DT is the average temperature differenceDT T1 T22?T3 T422Due to the symmetry of the temperature field in theinsert,only half of the cross-section of the insert wasanalysed.Changes of the density of the heat flux onthe surface of the insert and of the neighbouringtubes depend on the slagging factorc,which changessignificantly with location.The dispersion of the heatflux density on the surface of the insert and in thetube on the side of the furnace has been approxi-mated using a step line.The back surface of theinsert and the tubes was completely insulated.Onthe inside surface of the tube,the boundary conditionof the third kind,requiring the knowledge of the heattransfer coefficientaand the temperature of themedium Tmwas assumed.The heat load can be expressed as a function of themeasured temperature differenceq a b?DT3where the temperature difference DT is expressed byequation(2).Temperatures T1,T2,T3,and T4were computedusing the CFD software 11 for various values ofthe heat load q and the heat transfer coefficienta.The temperature of the medium was assumed to beTm 3208C.This is the temperature of the watervapour mixture in the evaporator of the OP-210boiler.The results of the numerical calculations wereapproximated using the function(3)by means ofthe least squares method.Constants a and b,whichdepend on the heat transfer coefficientaon theinside surface of the insert,equala 8367:9549W=m2;b 5357:8165W=m2Kfora 5000W=m2Ka 6800:9790W=m2;b 5432:89W=m2Kfora 10000W=m2Ka 4899:67W=m2;b 5519:0615W=m2Kfora 50000W=m2KThe analysis of the changes of the heat load q infunction DT proved that the heat transfer coeffi-cientaon the inside surface of the pipe has aminor influence on the heat load value q 10.This slightly surprising result can be explained bythe fact that when the value ofadecreases,the cir-cumferential heat flow from the front of the insertto its back side increases,which causes a drop inthe temperature through the thickness of the wall.Simultaneously,the reduction of theacoefficientcauses an increase of the insert temperature onthe side of the furnace,which in turn causesreduction of the thermal conductivity k determinedby equation(1)and increasing of the temperaturedrop through the thickness of the wall.Those twoopposite phenomena make q practically indepen-dent froma.For the on-line computations the following depen-dencyq q(DT)fora 10 000 W/(m2K)wasassumedq 6800:979 5432:89?DT W=m24Computer system for monitoring power boiler operation15JPE419#IMechE 2008Proc.IMechE Vol.222 Part A:J.Power and EnergyEquation(4)was derived with the assumption,thatthe interior surface of the insert is clean,and there areno residues of a low thermal conductivity coefficient(boiler scale or iron oxides)on the surface.If theinterior surface of the insert is covered with scaledeposition,then the temperature of the front surfaceof the insert increases,in turn causing the increase ofthe circumferential heat flux in the insert.To provethe correctness of the heat load q measurement in asituation,when the scale deposition characterizedby a low thermal conductivity coefficient accumu-lated on the interior surface of the insert,compu-tations of the temperature distribution for the cleanand dirty interior surface of the insert were carriedout,using FLUENT.Temperatures measured on the insert located at15.4 m level on the front wall of the evaporator ofthe OP-210 boiler:T1 405.1 8C,T2 402.4 8C,T3366.8 8C,T4 364.1 8C were used for verification.Temperature T5 318.2 8C of the external back sur-face(w 1808)of the insert was also known fromthe measurement.The density of the heat flux q,calculated fromequation(4),equals toq 6800:979 5432:89405:1 402:42?366:8 364:12?214888:7W=m25Measured temperatures for the clean insert formeda basis for the determination of the specific values ofthe heat load q,heat transfer coefficientaon theinterior surface of the insert,and the temperature ofthe medium Tm.Those values were derived usingthe control volume method,and FLUENT.The computations were carried out using the leastsquares method,for whichX5i1Tci?Ti2!min6andfollowingvalueswereobtained:q 220 135.3 W/m2,Tm 318.28C,anda 37 105.47 W/(m2K).Applying those values as data for FLUENT,thetemperature distributions at the cross-section of theinsert devoid of any residue and with scale depositionof thicknessd 0.5 mm(with the thermal conduc-tivity k 0.5 W/(mK)on the inside surface werecomputed.Thecomputedtemperaturesatthecharacteristic points of the cross-section are pre-sented in Table 1.Table 1 also contains,for the pur-pose of comparison,the measured temperatures.An analysis of the results proved that the measuredtemperatures Timatch the calculated temperaturesTcifor the clean insert.Assuming the calculated temperatures Tcifor theinsert with scale deposition to be the measured temp-eratures,the density of the heat flux q was calculatedusing equation(4)q 6800:979 5432:89642 636:582?600:86 596:362?227810:9W/m27The obtained value of the heat load agreed verywell the value derived from condition(6)equalling:q 220 135.3 W/m2.Accumulation of deposit onthe inside surface of the insert does not adverselyaffect the precision of the heat load measurement.2.2Results of the heat load measurementsThe described sensors in form of measuring insertswere installed on the middle tube of the frontwaterwall of the combustion chamber of the OP-210boiler.The inserts were mounted at four differentelevations:12.6,15.4,19.2,and 23 m.Real-time calcu-lations of heat load q can be displayed on the monitor.The values of the heat load for the determined discretepoints were approximated using the continuous func-tion(Fig.2(a).An analysis of the figure proves thatthe maximum values of heat load occur just above theburners.Changes to this heatload are determined con-tinuously with time.A sample history of the heat load,for the most thermally affected insert,at the level of15.4 m,is presented in Fig.2(b).Maximum heat loadvalues,occurring at this level are typical for steam boi-lers fuelled with pulverized coal 1.Since the heat flux measurements are carried out inthe on-line mode,heat flux distribution along the fur-nace height is known at any time.Table 1Temperatures at the characteristic points of thecross-sectionTemperatureCalculatedtemperature(cleaninsert)Tic(8C)MeasuredtemperatureTi(8C)Calculatedtemperature(insert withscaledeposition)Tic(8C)T1404.43405.1642.00T2402.05402.4636.58T3365.59366.8600.86T4363.99364.1596.36T5318.2318.2344.6516J Taler,B We glowski,W Zima,P Duda,S Gra dziel,T Sobota,A Cebula,and D TalerProc.IMechE Vol.222 Part A:J.Power and EnergyJPE419#IMechE 20083MEASUREMENT OF THE WATERCIRCULATION RATIO IN BOILEREVAPORATORBoiler start-up and shut-down processes,as well asboiler load changes shall be carried out in such way,that no allowable stresses are exceeded,while theessential natural circulation is maintained at alltimes.A rapid increase of pressure may causefading of the boiling process in water-wall tubes,whereas a rapid decrease of pressure leads to waterboiling in all elements of the boilers evaporator water-wall tubes and downcomers.Both cases cancause flow stagnation in the water circulation in theevaporator that leads to pipe cracking.In orderto examine the actual natural circulation in the evap-orator of the OP-210 boiler,the rate of water flow ismeasured continuously on two(from the total often)downcomer tubes with an outer diameter of273 mm and wall thickness of 25 mm.The flow-meters were installed on the opposite sides of theboiler,at the height of 10.5 and 11.5 m.The flowmeterconsists of two main elements:a measuring devicemanufacturedbyTorbarTMandadifferentialpressure converter manufactured by YokogawaTM.Figure 3 shows the results from measurementstaken during a steady-state boiler operation(boilerefficiency fluctuated between 180210?103kg/h)and the computed circulation ratio.From the analysisof the diagram,the velocity in the downcomer tubesranges between 1.6 and 1.8 m/s,while the circulationratio is at about eight to nine.On the basis of themeasured water flowrate and its variability range,the maximum allowable pressure change rates havebeen determined for the dp/dt evaporator(in orderto avoid the stagnation of water circulation in theevaporator).For the measured water velocity in the downco-mers(w 1.61.8 m/s)andthepressurep 10.79 MPa(at the beginning of the shut-down pro-cess)the allowable pressure lowering rate shallrange from 0.023 to 0.027 MPa/s 12(Fig.4(a).The pressure lowering rate at the boiler drum,resulting from the manufacturers recommendations,is set at 2 K/min 10 and is lower than the allowableFig.2Selected measurement and calculation results:(a)measuredtemperaturehistoriesandcalculated heat load for the measuring insertlocated at the height of 15.4 m,and(b)heatloaddistributionalongthecombustionchamber:14 measurement inserts,I and II,two rows of burners located,respectively,atthe height of 10.4 and 12.6 mFig.3Measured water velocity histories in boilerdowncomers(a)and(b),and determinedcirculation multiplicity(c)Computer system for monitoring power boiler operation17JPE419#IMechE 2008Proc.IMechE Vol.222 Part A:J.Power and Energypressure lowering rate established with regard to thestability of the water circulation in the evaporator(Fig.4(b).The analysis proved that if the boiler drum heatingand cooling rates recommended by the manufacturerare not exceeded,there is no risk of instability ofwater circulation occurring in the evaporator.4MONITORING OF THERMAL-HYDRAULICOPERATING CONDITIONSIn the following the determination of boiler effi-ciency,fuel and live steam mass flows as well as fur-nace slagging factor will be discussed in details.When coal is burned,a relatively small portion ofthe ash will cause deposition problems.Due to thedifferences in deposition mechanisms involved,twotypes of high temperature ash deposition have beendefined as slagging and fouling.Slagging is the for-mation of molten,partially fused deposits on furnacewalls and other surfaces exposed to radiant heat.Fouling is defined as the formation of high tempera-ture bonded deposits on convection heat absorbingsurfaces,such as superheaters and reheaters,whichare not exposed to radiant heat 13,14.Slaggingand fouling conditions are critical factors influencingreliability and availability of a coal-fired utility boiler.However,boiler surface deposits have been,tra-ditionally,one of the most difficult operating vari-ables to
收藏